精品国语人妻色乱码二区_久久青青青青青国产_黄色在线免费国产黄色_免费国产不卡一级αⅴ片

 

 

首頁 > Home > Investment > Key Investment Projects

Key Investment Projects

  I. Infrastructure

 

  Project No.: 01

  Project Name: Construction of Yangjiang Port Container Wharfs

  Description of Project: Yangjiang port is located 25 km to southwestern Hailing Bay and is facing the South China Sea. Its coastal line is about 9.9 km and it is a National Grade I opening-up port with convenient water transportation. It is planned to construct 23 berth wharfs .It is an important window in Southwestern China. Yangjiang New & Hi-Tech Development Experiment Zone is proposed to constructed 50, 000-ton class container wharfs in 17#, 18# berth wharfs so as to satisfy the logistics need of port-side large-scale industries.

  Cooperation Mode: Sole proprietorship, joint venture, cooperation

  Cooperation Duration: 10 years

  Total Investment: USD20 million (to be negotiated)

  Chinese Contribution: To invest by wharf recourses

  Foreign Contribution: To invest by capital

  Construction Site: The Portside Industrial Park, Guangzhou (Yangjiang) Industrial Transfer Park, Yangjiang Hi-tech Industrial Development Zone

  Infrastructure Conditions: Sufficient infrastructures for water supply, power supply and communication, including convenient traffic conditions.

  Project Progress: Project proposal is available.

  Category: Encouraged

  Contact Person: Mr.Wu Hairui

  Tel: 86-13664960082 86-3826928, 3823606        Fax: 3826928

 

  Project No.: 02

  Project Name: Construction of New Harbor-front District in Yangxi County

  Description of Project: It is located in estuary of Feitou River; the water in the principal channel is 20 meters after reconstruction, while it is 14 meters deep after ebbtide. Two 5-thousand-ton class wharfs, two 30-thousand-ton class, one 100-thousand-ton class wharfs are to be constructed here.

  Cooperation Form: Cooperative venture or joint venture.

  Cooperation Duration: 10 years.

  Total Investment: USD 25  million

  Chinese Contribution: To invest by capital or land transfer.

  Foreign Contribution: To invest by capital.

  Estimated Time for Reimbursement: 15 years

  Project Site: New Harbor-front District, Yangxi County

  Project Progress: Brief introduction to the project is available.

  Category: Encouraged

  Project Manager: Investment Promotion Bureau of Yangxi County

  Tel: 86-662-5556992  

  Project No.: 03

  Project Name: Yangjiang Bonded Logistics Center Project

  Description of Project: Yangjiang Bonded Logistics Center (Type B) is proposed to be constructed within the Portside Industrial Park, which is closely related to the operation area of Yangjiang Port, and is one of the key projects to develop harbor-front industry and create a logistics base of Southwestern China. An overall planned area of 5 sq. km., including 400, 000 sq. m. for the first phase, which will be provided with a full range of bonded logistics functions such as bonded warehousing, international transit, international distribution, international purchasing, international re-export trade, port function and export tax rebate, logistics information and etc.

  Cooperation Form: Joint venture, cooperative venture or cooperation

  Cooperation Duration: 3 years

  Total Investment: USD 300 million (to be negotiated)

  Chinese Contribution: To invest by land and port

  Foreign Contribution: To invest by capital

  Construction Site: The Portside Industrial Park, Yangjiang Hi-tech Industrial Development Zone

  Infrastructure Conditions: Sufficient infrastructures for water supply, power supply and communication, including convenient traffic conditions.

  Project Progress: Project proposal is available.

  Category: Encouraged

  Contact Person: Mr.Wu Hairui

  Tel: 86-13664960082,86-662-3826928 3823606     Fax: 86-662-3823263

  Description of Chinese Party: The Portside Industrial Park in Yangjiang Hi-tech Industrial Development Zone is a provincial-level model industrial Transfer park in Guangdong Province, entitled to various preferential policies formulated by the provincial government for Industrial Transfer parks.

 

  Project No.: 04

  Project Name: Wind-power Generation on the Sea

  Description of Project: This project is located in Guangdong Yangjiang Hailing Island, which are with rich wind power resources. The power energy output and input facilities is perfect. The island is on an offing of 5 to 10 meters deep by the coast. There is about 50 km coast line available for the development of wind power generation on the sea. And a wind power generation project with an installed generation capacity of 200, 000 kilowatts is planned to be constructed.

  Cooperation Form: Sole proprietorship

  Cooperation Duration: 50 years.

  Total Investment: USD 30 million

  Chinese Contribution: Provision of land

  Foreign Contribution: To invest by capital.

  Estimated Time for Reimbursement: 20 years

  Project Site: Northern coast of Hailing Island, the eastern and western sides of Hailing Levee

  Infrastructure Conditions: Sufficient water, power and energy, transportation, telecommunication facilities. 

  Project Progress: Brief introduction to the project is available.

  Category: Encouraged

  Project Manager: Mr. Chenlai Economic Development Bureau of Hailing Island Development Experiment Zone 

  Tel: 86-662-3896616  Fax: 86-662-3896603

 

  Project No.: 05

  Project Name: Wind-power Generation in Jiangcheng District

  Description of Project: Shanwaixi Village is located in the coastal area of northeastern Jiangcheng District. It is a village with sub-tropical maritime monsoon climate and an annual average temperature of 22.8. Its coast line is up to 13.9 km and it elevation is 30 meters. The wind area is remote from the living communities without arable lands and farming protection area, so there is no problem of ecology destroys. The wind area is rich with wind power, constant wind direction and low on flow ratio. The annual average wind speed in the observation point is over 7 meters per second (the wind speed requirement for a wind power generation field is over 5 meters per second), annual effective wind power hours are over 6, 000 hours. As a result, Shanwaixi Village totally fits the condition f constructing a wind power generation field.

  Cooperation Form: sole proprietorship

  Cooperation Duration: 50 years.

  Total Investment: USD 150 million

  Chinese Contribution: Provision of land and preferential polices

  Foreign Contribution: To invest by capital.

  Project Site: Yangjiang Jiangcheng District Fuchang Shanwaixi Village

  Infrastructure Conditions: Convenient water, road (railway) transportation; sufficient water, power and energy, gas, telecommunication facilities. 

  Project Progress: Brief introduction of the project, feasibility report are available

  Category: Permitted

  Project Manager: Liu Changzong

  Tel: 86-662-3811666

 

  Project No.: 06

  Project Name: Wind-power Generation in Shangyang Yangxi County

  Description of Project: There are rich wind recourses in Yangxi County and the development of wind power electricity is prevailing. This project is to use the wind power in the coastal area in Shangyang Town Yangxi County

  Cooperation Form: Sole proprietorship or cooperation

  Cooperation Duration: 50 years.

  Total Investment: USD 80 million

  Chinese Contribution: Provision of land transfer or capital

  Foreign Contribution: To invest by capital.

  Estimated Time for Reimbursement: 15 years

  Project Site: Shangyang Town Yangxi County

  Infrastructure Conditions: rich wind power

  Project Progress: Brief introduction of the project

  Category: Encouraged

  Project Manager: Investment Promotion Bureau of Yangxi County

  Tel: 86-662-5556992

 

  . Industry

 

  Project No.: 07

  Project Name: Nickel Alloys Supporting Downstream Product Base in Yangjiang

  Description of Project: Yanjiang nickel alloy materials base is located in the port area of Yangjiang. Nickel alloy is one of the materials of making stainless steel and stainless alloy. Yangjiang New & Hi-tech Zone matches the basic conditions for the development of nickel alloy industry, including of transportation of raw materials (Yangjiang Port), electricity, logistics and market etc.. The nickel alloy industrial chain and its supporting processing project collaborated by Guangdong Guangxin Foreign Train Group Co., Ltd and Zhejiang Qingshan Group Co., Ltd has settled in the zone, the total investment capital is about RMB 19.55 billion Yuan, the forming of the chain will push foreword the development of down stream industrial chains.

  Cooperation Duration: 50 years.

  Total Investment: USD 200 million (to be negotiated)

  Chinese Contribution: Provision of land transfer or capital

  Foreign Contribution: To invest by capital.

  Project Site: The port areaGuangdong Yangjiang New & Hi-tech Zone

  Infrastructure Conditions: Water, electricity, telecommunication, road etc..

  Project Progress: Brief introduction of the project

  Category: Encouraged

  Project Manager: Wu Hairui

  Tel: 86-13664960082 86-662-38269283823606

  Fax: 86-662-3823263

 

  Project No.: 08

  Project Name: Yangjiang New & Hi-tech Development Experiment Zone semiconductor Energy-saving Base

  Description of Project: The first stage of construction area Yangjiang New & Hi-tech Development Experiment Zone semiconductor Energy-saving Base is 3 sq. km.. It is located in Fugang District; this district’s leading industry is new type energy-saving, environment-friendly industries. Its focus development orientation is semiconductor lighting energy-saving industries and its objective is to make the district a national important semiconductor lighting energy-saving industry development center, production base and trading platform. At present, Yangjiang Hanneng Industry Co. Lit. has settled in. Its leading products are LED energy-saving lights.

  Cooperation Form: Sole investment joint venture or cooperative venture

  Cooperation Duration: 10 years

  Total Investment: USD 300 million (to be negotiated)

  Chinese Contribution: In the forms of capital or land transfer etc..

  Foreign Contribution: To invest by capital or other modes

  Project Site: Fugang District in Guangdong Yangjiang New & Hi-tech Development Experiment Zone

  Infrastructure Conditions: Sufficient infrastructures for water supply, power supply and communication, including convenient traffic conditions. 

  Project Progress: Approval by the provincial government

  Category: Encouraged

  Contact Person: Wu Hairui 

  Tel: 86-13664960082 86-662-3826928、3823606

  Fax: 86-662-3823263

 

  Project No.: 09

  Project Name: Development of Limestone Mineral

  Description of Project: There are rich limestone mineral resources in Yangchun. At present, there are in total 8 reserves of limestone mineral sites. And the total reserves reach 380.33 million tons. The composition of CaO is all above 50%. The Liuguilan and Baima Mineral Zone in Shiwang have the largest and best reserves. There are more than 8.5 billion tons B+C+D class limestone mineral in Niuguilan (including more than 2.5 billion tons of B class; more than 3.8 billion tons of C class; more than 220 million tons of D class). The composition of CaO is 52.71%~55.71;according to latest exploration, there are in total more than 6.4 billion tons of D class limestone mineral in Baima Mineral Zone, The composition of CaO is 53.50%~54.55. According to Yangchun’s limestone formation and structure, it is estimated that the limestone reserves in Yangchun are above 1 billion tons. So the quality of limestone is good with high value and use, it can be used as the main material in the industries of cement, metallurgy, medicine, food, chemicals etc..

  Cooperation Form: Sole investment joint venture or cooperative venture

  Cooperation Duration: 30 years

  Total Investment: USD50 million (to be negotiated)

  Chinese Contribution: To invest by land and capital

  Foreign Contribution: To invest by capital

  Estimated Time for Reimbursement: 5 years

  Project Site: Yangchun

  Infrastructure Conditions: Rich limestone mineral reserves, water, electricity, telecommunication and road.

  Category: Encouraged

  Contact Person: Mr. Zhu Wei from Yangchun Land and Resources Bureau, Ms. Liang Wenjing from Yangchun Investment Promotion Bureau

  Tel: 86-662-7731681、7733799  Fax: 86-662-7742533

 

  Project No.: 10

  Project Name: Solar Photovoltaic in Yangjiang New & Hi-Tech Development Experiment Zone

  Description of Project: Solar photovoltaic is a clean, high effective and everlasting new energy, at the same time solar energy is better than other types of energy in the perspective of quantity, widely distribution, cleanness and dependable technology. Solar photovoltaic is safer, dependable, pollution-free, less restriction, lower failure rate and easy to operate, so it is advantageous and realistic to develop solar energy here.

  Cooperation Form: Sole proprietorship

  Cooperation Duration: 10 years.

  Total Investment: USD 50 million (to be negotiated)

  Chinese Contribution: Provision of land transfer or capital

  Foreign Contribution: To invest by capital or other forms.

  Project Site: Guandong Yangjiang New & Hi-tech Development Zone Industrial Park 

  Infrastructure Conditions: Water, electricity, telecommunication, transportation etc..

  Project Progress: Brief introduction of the project

  Category: Encouraged

  Project Manager: Wu Hairui

  Tel: 13664960082 86-662-3826928、3823606

  Fax:86-662-3823263

 

  Project No.: 11

  Project Name: New Industrial Production Base in Yangjiang New & Hi-tech Development Experiment Zone

  Description of Project: The planned area of new industrial production base in Yangjiang New & Hi-tech Development Zone is 20, 000 square kilometers; it is adjacent to Yangjiang-Yunfu Express Way and Zhan Gang Road, so the transportation is rather convenient. The total investment of the base is more than RMB 200 million Yuan. More than 100 enterprises will settle in the base, annual production value will exceed RMB 10 billion Yuan. At present Guangdong Deer Electric Appliance has settled in and put into production.

  Cooperation Form: sole proprietorship or cooperation

  Total Investment: USD 200 million (to be negotiated)

  Chinese Contribution: Provision of land transfer or capital etc.

  Foreign Contribution: To invest by capital

  Project Site: Guandong Yangjiang New & Hi-tech Development Zone Industrial Park

  Infrastructure Conditions: Water, electricity, telecommunication, transportation etc..

  Project Progress: Brief introduction of the project

  Category: Encouraged

  Project Manager: Wu Hairui

  Tel: 13664960082 86-662-3826928、3823606

  Fax:86-662-3823263

 

  Project No.: 12

  Project Name: Heavy Industry Production in Yangjiang New & Hi-tech Development Experiment Zone

  Description of Project: Yangjiang New & Hi-tech Development Experiment Zone Industrial Park is located near the National Class one port—Yangjiang Port. The coast line of Yangjiang Port is about 9.9 kilometers. The transportation is rather continent with Yangjiang-Yangchun Railway and port wharfs in the industrial park. So it is with advantages to develop heavy industry projects.

  Cooperation Form: Sole proprietorship

  Cooperation duration: 20 years

  Total Investment: To be negotiated

  Chinese Contribution: Provision of land transfer etc.

  Foreign Contribution: To invest by capital

  Project Site: Guandong Yangjiang New & Hi-tech Development Experiment Zone Industrial Park

  Infrastructure Conditions: Water, electricity supply; telecommunication facilities and convenient transportation etc..

  Project Progress: Brief introduction of the project

  Category: Encouraged

  Project Manager: Wu Hairui

  Tel: 13664960082 86-662-3826928、3823606

  Fax: 86-662-3823263

  Introduction of the Chinese Party: Yangjiang New & Hi-tech Development Experiment Zone is a New & Hi-tech zone approved by Guangdong government. Relevant regulations to encourage development have been made and a serials of preferential polices have been carried out in land, water, electricity, fee charge, management, service etc.. 

 

  Project No.: 13

  Project Name: Production of Ceramics

  Description of Project: There are rich ceramics resources in Yangxi County and its surrounding area, a large deposition of good quality quartz sand (silica sand mine) is detective to be here, it is estimated that the deposition is more than 50 million tons, the degree of purity reaches 99.2%. Besides, there are more than 30 types of ore resources like rare-earth ore, silicon iron and potassium feldspar within Yangxi County. These ores are the main materials of ceramic production and suitable for large scale of exploration, so there is high development value and prospective. It is to build 45 environment-friendly ceramic production lines to product eco-ceramics, environment –friendly ceramics, energy-saving ceramics, cultural-ceramics and art ceramics and new material ceramics etc..

  Cooperation Form: Cooperation, joint venture or sole proprietorship

  Cooperation duration: 10 years

  Total Investment: USD 200 million

  Chinese Contribution: Provision of land transfers and invests of capital etc.

  Foreign Contribution: To invest by capital and equipments etc..

  Expected payback period:10 years

  Project Site: Yangxi Xinxu Industrial Park

  Infrastructure Conditions: Water and electricity supply, telecommunication and transportation facilities etc..

  Project Progress: Brief introduction of the project

  Category: Encouraged

  Project Manager: Yangxi County Investment Promotion Bureau

  Tel: 06625556992

 

  Project No.: 14

  Project Name: Production and Manufacturing of Rare-earth Permanent Magnet Materials

  Description of Project: Rare-earth permanent magnet material is a kind of alloy made out of rare-earthmetal andtransition metals. It is one of the important basic materials for modern electronic information industry and is closely related to people’s daily life. With the widespread of telecommunication equipments like computer, mobile phone, automobile phone etc., and the high development of energy-saving automobile, there is a great demand for rare-earth permanent magnet materials. In recent years the demand is increased by 30% every year. The rapid development of rare-earth permanent magnet materials is remarkable.

  Cooperation Form: Cooperation or joint venture

  Cooperation duration: 15 years

  Total Investment: USD 50 million

  Chinese Contribution: Provision of land transfers and invests of capital etc.

  Foreign Contribution: To invest by capital

  Expected payback period:8 years

  Project Site: Yangxi Xinxu Port District

  Infrastructure Conditions: There are rich mine recourses like rare-earth, monazite, zircon, granite, quartz silica sand, ilmenite, gold and tin etc. within Yangxi County. The deposition of rare-earth is the biggest. While ilmenite, zircon and monazite etc. are mainly deposited in Shangyang and Yudong Town. Granite, gold are mainly deposited in Chengchun Town

  Project Progress: Brief introduction of the project

  Category: Encouraged

  Project Manager: Yangxi County Investment Promotion Bureau

  Tel: 06625556992

 

  Project No.: 15

  Project Name: Yacht Manufacturing Base

  Description of Project: This project is located in the national class fishing port—Zhapo Port, a yacht base focuses on yacht manufacturing and fishing boat manufacturing & maintaining is to be built here. Base on the rich sea tourism recourses and with wholesome fishing supplement, fishing boat wharfs for Hong Kong and Macau boats, there is great potential to develop this project here.

  Cooperation Form: Cooperation, joint venture or sole proprietorship

  Cooperation duration: 20 years

  Total Investment: USD 50 million

  Chinese Contribution: Provision of land transfers

  Foreign Contribution: To invest by capital

  Expected payback period:10 years

  Project Site: Zhapo Town in Hailing Island

  Infrastructure Conditions: Water, electricity, transportation and telecommunication facilities.

  Project Progress: Brief introduction of the project

  Category: Encouraged

  Project Manager: Mr.Chen Lai from the Economic Development Bureau of Hailing Island Experimental District

  Tel:86-662-3896616

  Fax: 86-662-3896603

 

  Project No.: 16

  Project Name: Quartz GlassManufacturing

  Description of Project: Quartz glassaspecial glass made out of natural quartz crystal (crystal or pure silica) or saline synthesis through high-temperature melting. Quartz glass is widely used in the manufacturing of semiconductor, electric lighting device, communications semiconductor devices, lasers, optical instruments, laboratory equipment, electrical equipment, medical equipment and in the industries of high temperature resistant chemical equipment, like chemical, electronics, metallurgy, building materials and national defense.

  Cooperation Form: Cooperation, joint venture

  Cooperation duration: 15 years

  Total Investment: USD 30 million

  Chinese Contribution: Provision of land transfers or capital

  Foreign Contribution: To invest by capital

  Expected payback period:8 years

  Project Site: Yangxi Town Port District

  Infrastructure Conditions: There are rich mineral recourses in Yangxi Town, the deposition of quartz sand is over 60 million tons with a purity rate of 99.2%, and there are complete water, electricity, transportation and telecommunication facilities.

  Project Progress: Brief introduction of the project

  Category: Encouraged

  Project Manager:  Yangxi Town Invest Promotion Bureau

  Tel:06625556992

 

  Project No.: 17

  Project Name: Development of Marine Health Products

  Description of Project: This project aims to build a marine health industry development platform through the combination of production and study and base on the rich marine recourses and. Our aim is to study marine health technology and strike efforts in the development of marine health products, to introduce a serial of hi-tech, high quality marine health medicine and food, to open up a new industry of primitive ecology “blue health product”.

  Cooperation Form: Cooperation, sole proprietorship

  Cooperation duration: 50 years

  Total Investment: USD 150 million

  Chinese Contribution: Provision of recourses or land transfers

  Foreign Contribution: To invest by capital

  Expected payback period:6 years

  Project Site: Inside the Aquatic Products Processing Industrial Park in Hailing Island

  Infrastructure Conditions: There are complete water, electricity, transportation and telecommunication facilities.

  Project Progress: Brief introduction of the project

  Category: Encouraged

  Project Manager:  Mr. Tan Gengqiang from Agriculture and Marine Fisheries Service Bureau of Hailing Island Experimental District

  Tel:86-13326599328    

  Fax:86-662-3890105

 

  . Tourism

 

  Project No.: 18

  Project Name: Donghu Lake Tourism Resort in Yangdong County 

  Description of Project: Donghu Lake Tourism Resort covers a total land area of 21 sq, km., including lake area of 8 sq. km. with a storage capacity of 127 million cubic meters. Surrounded by mountains with lush forests, there are 108 small islands, creating scenery as beautiful as a painting. Donghu Lake Tourist Resort is blessed with abundant hot springs and unsurpassed natural tourism resources that show a great potential for development, for example, hydro-helicopter project, classical garden resorts of Japanese, Thai and Chinese styles, religious culture promotion projects like Liangshan Temple and White-Horse Temple, eco-tourism orchard, spa center, dedicated shooting range as well as comprehensive development for tourism, business, culture and education.

  Cooperation Form: Cooperative cooperation.

  Cooperation Duration: 50 years.

  Total Investment: USD 600 million

  Chinese Contribution: To invest by the existing land, recourses and facilities  

  Foreign Contribution: USD600 million

  Estimated Time of Reimbursement:8 years

  Construction Site: Nalong Town, Yangdong County

  Infrastructure Conditions: Sufficient infrastructures for water supply, power supply and communication, including convenient traffic conditions.

  Project Documents: Brief introduction to the scenic spot and project proposal

  Category: Permission

  Project Manager: Mr. Feng Min form the Tourism Management Center of Yangdong County

  Tel: 86-662-6616251 

  Fax: 6611536

 

  Project No.: 19

  Project Name:Luoqin Yacao Tourism Resort

  Description of Project: Based on the development of characteristic tourism as a main line, Luoqin Yacao Tourism Resort project is planned to be built into a popular tourist attraction relying on the crystal clear spring water in valleys and mainly engaged in water sports as main functions, where the drift holiday travel district is divided into five scenic areas as Entrance Reception, hi-tech Agricultural Plantation, Golf Court, Water Entertainment and Lakeside Resort.

  Cooperation Form: Sole proprietorship

  Cooperation Duration: 30 years

  Total Investment: USD 80 million

  Chinese Contribution: To provide preferential policies.

  Foreign Chinese Contribution: USD 75 million

  Estimated Time of Reimbursement:10 years

  Construction Site: Luoqin Mountain, Baisha Street Subdistrict Office, Jiangcheng District

  Infrastructure Conditions: Sufficient infrastructures for water supply, power supply, gas supply, communication and traffic.

  Project Documents: Brief introduction to the projectfeasibility study report and project proposal are ready.

  Category: Permitted

  Project Manager: Mr. Li Guodong from Baisha Street Subdistrict Office of Jiangcheng District

  Tel: 86-62-2200388  Fax: 2200145

 

  Project No.: 20

  Project Name: Dashu Island Tourism Spot

  Description of Project: this project is to develop Dashu Island base on its sub-tropical scenery. A recreation and entertaining theme park covering 5, 000 acres is to be built here. It is a unique tourism district of water sports, swimming, and leisure.

  Cooperation Mode: Sole venture

  Cooperation Duration: 50 years

  Total Investment: US 85 million

  Chinese Contribution:Tourism recourses andland

  Foreign Contribution: Bycapital and technology

  Estimated Investment Recovery Period: 8 years

  Construction Site: Yangixi County Shangyang Town Dashu Island

  Infrastructure Conditions: Convenient water and road transportation facilities.

  Project Documents: Brief introduction of the project

  Category: Encouraged

  Project Manager: Shen Jianyaun from the office of the People’s Government of Yangxi County

  Tel:86-662-5542216  

  Fax: 86-662-5551675

 

  Project No.: 21

  Project Name: Er Huangzhang Mountain Ecotourism Zone

  Description of Project: Er Huangzhang Mountain is located in Bajia Tourism District in Yanghchun, it is a natural preservation zone of Guangdong Province and it is only 70 kilometers from the downtown. There are rare national conservative plantsand rich, beautiful scenery like the famous Baishui Waterfall and Bajia Fairy Lake. This project is to develop relevant project and facilities of the lake scenery, waterfall scenery, on the lake entertainment, hot spring resort and exploration, to build this district into a mountain Ecotourism Zone.

  Cooperation Mode: Joint venture or cooperation

  Cooperation Duration: 50 years

  Total Investment: US 350 million

  Chinese Contribution:Tourism recourses andland

  Foreign Contribution: Bycapital

  Estimated Investment Recovery Period: About 8 years

  Construction Site: Bajia Town in Yangchun City

  Infrastructure Conditions: Convenient water and road transportation

  Project Documents: Feasibility study report and provincial approval documents of the project

  Category: Encouraged

  Project Manager: Zeng Qingchan from Yangchun Tourism, Foreign and Overseas Chinese Affairs Bureau; Liang Wenjing from Yangchun Investment Promotion Bureau.

  Tel:86-662-7732795、7733799  

  Fax: 86-662-7742533

 

  Project No.: 22

  Project Name: Theme Park of Constant Temperature Seawater

  Description of Project: This project is to build a eco-recreation holiday hotel in Hailing Island through temperature treatment of the sea water, at the same time to introduce the international concept of health, to develop water entertaining and creation projects like mud, sand bath, Chinese medicine therapy, spa and water screen film.

  Cooperation Mode: Joint venture, cooperation or sole venture

  Cooperation Duration: 30 years

  Total Investment: US 300 million

  Chinese Contribution: By land

  Foreign Contribution: Bycapital

  Estimated Investment Recovery Period: 10 years

  Construction Site: Yangchun City Bajia Town

  Infrastructure Conditions: Xiading Bay or Beiding Bay in Hailing Island

  Project Documents: Feasibility study report and provincial approval documents of the project

  Category: Encouraged

  Project Manager: Chen Zhangxing from Hailing Islang Experimental District Touris Bajia Town and Sports Bureau

  Tel:86-662-3890246 

  Fax:86-662-3880553

 

  Project No.: 23

  Project Name: Original Ecological Agriculture and Fishery Resort

  Description of Project: This projects strike efforts to build a Yangtze River Delta ecological characteristics agriculture and fisheries resort based on the rich natural resources like water area, tidal flats and wetlands and fishery production facilities. The aim is to build a fishery village of ecological agriculture and fisheries, wetland and recreation, entertainment, holiday and special catering.

  Cooperation Mode: Joint venture or sole venture

  Cooperation Duration: 50 years

  Total Investment: USD 420 million

  Chinese Contribution: To provide relevant recourses, land and sea area etc.

  Foreign Contribution: Bycapital

  Estimated Investment Recovery Period: 12 years

  Construction Site: Tidal flats and high lands in Beiding, Beiji, Beiyang in Hailing Island, the western side of the road around Hailing Island

  Infrastructure Conditions: Xiading Bay or Beiding Bay in Hailing Island

  Project Documents: Brief introduction of the project

  Category: Encouraged

  Project Manager: Tand Gengqiang from Hailing Island Experimental District Agriculture and Ocean Fishery Bureau

  Tel:86-13326599328 

  Fax: 86-662-3890105

  . Agriculture, Forestry & Fishery

 

  Project No.: 24

  Project Name: Yangjiang Fish and Fishery Product Logistic Center

  Description of Project: This project is to be built in a very advantageous location within the port district of Yangjiang New & Hi-tech Development Experiment Zone. The aim is to strike efforts to build a fish and fishery product logistic center services the western Guangdong base on advantages of convenient transportation network like water road, railway and road etc., and combined with the strong logistic service demand in Yangjiang New & Hi-tech Development Experiment Zone. The focus is to develop the functions of the logistic center in terms of fish and fishery product’s wholesale, transportation, delivery and information service ect., gradually to form a regional fish and fishery product logistic hub connecting the surrounding cities and covering the western Guangdong area even the whole province.

  Cooperation ModeCooperation

  Cooperation Duration: 30 years

  Total Investment: USD 80 million (to be negotiated)

  Chinese Contribution: To invest by land and wharfs

  Foreign Contribution: By capital 

  Project Construction Site: The port district in Guangdong Yangjiang New & Hi-tech Development Experiment Zone

  Infrastructure Conditions: Water, electricity supply, convenient telecommunication and transportation etc.

  Project Documents: Brief introduction of the project

  Category: Encouraged

  Project Manager: Wu Hairui

  Tel: 86-13664960082, 86-662-3826928, 3823606 

  Fax: 86-662-3823263

 

  Project No.: 25

  Project Name: Yangdong CountyAquatic Product Deep-processing

  Description of Project: Yashao Town is a coastal town near the city; the coast line is 19.2 kilometers, oyster aquiculture is rather popular in very family, especially there are advantageous environment for the oyster aquiculture in Beijin, as a result, both production quantity and quality of this town’s oyster is much better than that of other places. This project is to attract hi-tech aquatic enterprises of less environment pollution through its good production recourses. At the same time to provide more employment opportunities for the local people.

  Cooperation ModeCooperation

  Cooperation Duration: 30 years

  Total Investment: USD 35 million

  Chinese Contribution: To invest by land.

  Foreign Contribution: USD 30 million

  Estimated Investment Recovery Period: 12 years

  Project Construction Site: Yashao Town in Yangdong County

  Infrastructure Conditions: Water, electricity supply, telecommunication and transportation facilities etc.

  Project Documents: Brief introduction of the project

  Category: Allowable

  Project Manager: Xu Liujin from the People’s Government of Yahshao Town

  Tel: 86-13827666499 

  Fax: 86-662-6790188

 

  Project No.: 26

  Project Name: Deep Processing of Silkworm Cocoon in Yangchun City

  Description of Project: The plantation area and production of silkworm cocoon in Yangchun rands on top of the other counties (cities) in Guangdong, it is a silkworm cocoon production county (city) in Guangdong. Deep processing of silkworm cocoon has been listed as one of the major development projects in Yangjiang’s “Twelfth-Five” plan, it is planned to plant 0.15 million acres silkworm cocoon within 2 years and the whole city’s silkworm cocoon production will reach 22,000 tons by the time. At present, there is only one silkworm deep processing enterprise in the city, which is hard to meet the demand of the whole city’s silkworm cocoon industrialization, so a new enterprise of silkworm cocoon deep processing is called for. 

  Cooperation ModeSole venture  

  Cooperation Duration: 50 years

  Total Investment: RMB 150 million Yuan

  Chinese Contribution: To invest by land.

  Foreign Contribution: By capital

  Estimated Investment Recovery Period: 5 years

  Project Construction Site: Heshui Town

  Infrastructure Conditions: Water, electricity supply, telecommunication and transportation facilities etc.

  Project Documents: Feasibility report of the project is available

  Category: Encouraged

  Project Manager: Zhu Yunyi from Yangchun Agriculture, Forestry and Fisheries Bureau; Liang Wenjing from Yangchun Investment Promotion Bureau

  Tel: 86-662-7733319, 7733799 

  Fax: 86-66286-7742533

 

  Project No.: 27

  Project Name: Plantation andDeep Processing of Yangchun Villous Amomum

  Description of Project: Villous amomum is a local special of Yangchun, it is one of the “Four South Herbs” of China and is famous for its unique quality in the medicine market. At present it has become an important pillar economic industry in Yangchun. Yangchun is appraised as ‘China Town of Villous Amomum’ in 2004, appraised by the State Quality Inspection Administration as a national geographic labeling product, and granted the title of ‘Guangdong People’s Most Favorite Local Specialty’ in 2007. To speed up the development of Villous Amomum industry and build a Villous Amomum special industrial base has became an important act for Yangchun to carry out the policy namely: to promote strategy through label effect, to reach the strategic aim of “to Promote the Market through South Herb” and construction of new socialist rural villages.

  Cooperation Mode: Sole proprietorship, joint venture or cooperation

  Cooperation Duration: To be negotiated

  Total Investment: USD 50 million

  Chinese Contribution:To provide land and recourses etc.

  Foreign Contribution:To invest by capital

  Estimated Investment Recovery Period: 3 to 5 years

  Construction Site: Streets in Chuncheng, Chunwan Town, Heshui Town, Yongning Town etc. in Yangchun

  Infrastructure Conditions: Provided with sufficient infrastructures for water supply, power supply and communication, including traffic conditions like railways and highways.

  Project Documents: Brief introduction and preferential policies material of the project available

  Category: Encouraged

  Project Manager: Zhu Yunyi Yangchun Agricuture, Forestry and Fisheries Bureau; Deng Yueguang from Yangchun Technology, Industry and Trade Bureau

  Tel: 86-662-7737442, 7733383   

  Fax: 86-662-7737442

 

  Project No.: 28

  Project Name: Prawn Breeding and Processing Base in Yangdong County

  Description of Project: This project is to make good use of Dongping Town’s geographic location and convenient transportation for prawn breeding and to build a breeding base with 2, 000 arcs high pool. At the same time to introduce prawn processing, package and frozen equipments. to breed sale the prawns from the base.

  Cooperation Mode: Joint venture or cooperation

  Cooperation Duration: 30 years

  Total Investment: USD 30 million

  Chinese Contribution:To provide land

  Foreign Contribution:USD 20 million

  Construction Site: Dongping Town in Yangdong County

  Infrastructure Conditions: A breeding pool of 3, 000 acres available tointroduce sea water and fresh water; electricity, supply, telecommunication facilities and convenient transportation.

  Project Documents: Feasibility report of the project available

  Category: Encouraged

  Project Manager:  Yang Daidong from the Peolple’s Government of Dongping Town

  Tel: 86-662-6650398, 86-13794788869  

  Fax:86-662-6650398

 

  Project No.: 29

  Project Name: Shallow Sea Ecological Breeding in Hailing Island

  Description of Project: This project is located in the shallow sea in northern Hailing Island; the beaches there are wide with clear and clean sea water. The temperature of the sea water is very suitable for shallow sea seashell breeding. There is about 7, 000 acres arca granosa farm. The total area of the project is 46,000 mu and the varieties of seashells under breeding are mainly arca granosa and perna viridis, including 7, 000 mu of arca granosa with an annual production f 8, 000 tons and 40, 000 mu of perna viridis with an annual production of 35, 000 tons. The supporting facilities of the project are seashell deep processing factory and tourism attractions like experiencing life in the fishermen’s home etc..

  Cooperation Mode: Sole proprietorship, joint venture or cooperation

  Cooperation Duration: 50 years

  Total Investment: USD 60 million

  Chinese Contribution:To provide land

  Foreign Contribution:To investby capital

  Estimated Investment Recovery Period: 6 years

  Construction Site: Beiting, Shangyang Village Committees etc. in Hailing Town

  Infrastructure Conditions: Electricity supply, telecommunication facilities and convenient transportation.

  Project Documents: Materials of the project planning available 

  Category: Encouraged

  Project Manager:  Tan Gengqiang from Hailing Island Development Experiment Zone Agriculture and Ocean Fishery Bureau

  Tel: 86-13326599328   

  Fax: 86-662-3890105

 

  Project No.: 30

  Project Name: Sea Horse Breeding and Processing Base in Hailing Island

  Description of Project: The project is located beside of national fishing port of Zapo Fishing Port; there are good quality sea water resources. With the application of modern production equipments and technology to make research and develop the artificial breeding, deep-processing of sea horses. The annual breeding quantity of sea horses are 1, 000 , annual processing value of sea horse health capsule, health liquid, sea horse wine ect. reaches USD 20 million. A deep-processing base of high add-on-value marine food is established.

  Cooperation Form: Sole proprietorship or cooperative cooperation

  Cooperation Duration: 20 years

  Total Investment: USD 35illion

  Chinese Contribution: To invest land

  Foreign Contribution: To invest by capital, technology, equipment and other forms

  Estimated Investment Recovery Period: 10 years

  Construction Site: Hailing Town, Hailing Island Pilot Zone, Yangjiang City

  Infrastructure Conditions: Sufficient infrastructures for water and power supply and communication, including convenient traffic conditions.

  Project Documents: Layout documents are available.

  Category: Encouraged

  Project Manager: Jin Guogu

  Tel: 86-662-3888261 Fax: 86-662-3888261